1200 tph loading and 2 x 300 tph unloading capacity combi shiploader- unloader crane at Mersin Port on TMO Jetty was damaged due to an accident on June 17.
Bulk unloading jib 01 and related machinery, including suction tubes, vertical and horizontal machinery with all accessories were new built and erected on to the crane. Complete new gangway ladder with self-leveling steps was new built and mounted on to the crane. All lifting and luffing cables for the remaining 2 nos jibs and all safety switches were replaced and commissioned by ISKAR.